AI News
  • Home
  • News
  • Berlin
  • Munich
  • Leipzig
  • Frankfurt
  • Moving to Germany
  • Country: Germany
    • Netherlands
    • United Kingdom
    • Germany
    • France
    • Spain
    • All countries
  • English
  • العربية
  • Deutsch
No Result
View All Result
AI News
  • Home
  • News
  • Berlin
  • Munich
  • Leipzig
  • Frankfurt
  • Moving to Germany
  • Country: Germany
    • Netherlands
    • United Kingdom
    • Germany
    • France
    • Spain
    • All countries
  • English
  • العربية
  • Deutsch
No Result
View All Result
AI News
No Result
View All Result

Berlin A100 Bridge Closure Extended to 31 January

Ramo by Ramo
12 November 2026
in Berlin, Germany News
2
A yellow and red S-Bahn train blurs across an elevated bridge in front of the domed Bode Museum on a snowy winter day.

Bode Museum and S-Bahn train, Berlin. Photo: Irina Nesterenko/Pexels

0
SHARES
3
VIEWS
Summarize with ChatGPTShare to Facebook

The outer lanes of the Rudolf-Wissell-Brücke on Berlin’s A100 city motorway will stay closed until at least 31 January, according to the Autobahn GmbH, the federal motorway company. The closures, which began as a two-week measure, now run for months because of wider checks on the bridge.

What happened

The Berliner Morgenpost, citing the Autobahn-Gesellschaft, reports that the outer lanes of the A100 on the bridge have been closed since 7 October. At first, the right-hand lane in each direction was meant to be unavailable for only two weeks. The closure is now expected to last until 31 January.

The reason is a damaged Spannglied, a steel tendon that holds the bridge structure under tension. It has to be replaced. Until that is done, the Autobahn GmbH says the bridge cannot carry its full load. The bridge is part of one of the busiest motorway sections in Germany.

The checks have also grown. All other tendons on the bridge are being inspected. External experts (Gutachter) have so far completed half of this examination, the Autobahn-Gesellschaft said. Tendons that have already been exposed are being partly repaired on the spot. The damaged tendon will be exchanged once the investigations are finished.

The bridge is about 930 metres long, which makes it the longest road bridge in Berlin, according to the report. Around 180,000 vehicles cross it every day.

What it means for you

If you drive on the A100 across the Rudolf-Wissell-Brücke, expect congestion to continue. The article says road users must keep reckoning with Staus (traffic jams) on this stretch. With the closure now running to 31 January, the delays will not end after a few weeks, as first planned.

Advertisement

This affects car commuters, delivery drivers, taxi and ride-hailing users, and anyone who takes this motorway to reach other parts of the city or to leave Berlin. Because roughly 180,000 vehicles use the bridge daily, a loss of two lanes puts pressure on a very large number of journeys.

The source does not name detours, alternative public transport lines or specific times of day when the jams are worst, so we cannot give those. Practical steps that follow from the facts are these:

  • Plan extra travel time on any route that includes the A100 at the bridge, at least until 31 January.
  • Check live traffic information before you set off, as the closure has already been extended once.
  • If you drive for work, tell your employer or clients that delays on this stretch may last into the new year.

The Autobahn GmbH says the end date depends on the inspections. Treat 31 January as the current estimate (the source says “voraussichtlich”, meaning expected), not a guarantee.

What watch next

Three developments are worth following.

First, the second half of the expert examination. The result will decide whether the tendon replacement can go ahead on schedule and whether 31 January holds.

Second, the replacement of the damaged tendon itself, which the Autobahn-Gesellschaft plans after the investigations end.

Third, the longer-term plan. According to the Autobahn-Gesellschaft, a Ersatzneubau (replacement building) is planned for the bridge, with two separate bridges. The article gives no dates or costs for this.

The closure is also part of a wider pattern. The Morgenpost notes that the A100 has seen repeated large closures for months because several bridges are in poor condition and are being demolished. The best-known case is the Ringbahnbrücke, which belonged to the Dreieck Funkturm (the Funkturm motorway junction). It was closed in spring 2025 because of a spreading crack in its load-bearing structure and was later demolished. Its replacement is already under construction. The Westendbrücke, further north, has also been rebuilt, with construction starting at the end of December 2025.

For residents, the message is simple: build in extra time on the A100 for the coming months, and keep an eye on updates from the Autobahn GmbH.

Source: Berliner Morgenpost

Advertisement

Sources

  • Berliner Morgenpost: Verkehrs-Chaos droht: A100-Sperrung zieht sich bis ins nächste Jahr, accessed 12 November 2026

Berlin, for internationals

One email a week: what changed for internationals in Berlin, the week's news from Germany, and one guide worth reading. No spam, unsubscribe any time.

Tags: Berlin
SummarizeShare
Ramo

Ramo

Ramo is the editor of Mylistingo, which publishes daily local news and practical guides for internationals living in the Netherlands, the United Kingdom, Germany, France and Spain, in English, Arabic and local languages. Every article links to the sources it is based on.

Related Stories

Aerial view over Munich's old town with red-tiled roofs and the twin onion-domed towers of the Frauenkirche under a blue, cloudy sky.

Munich Plans One Central Login for City Services

by Ramo
12 November 2026
2

Munich plans one login for all city services under a new digital strategy. The city council makes the final decision on 25 November.

Black and white aerial view of the Spree River and Nikolaiviertel, with Berlin Cathedral, the Red Town Hall and the TV Tower under cloudy skies.

Germany delays sugar tax and shelves electricity tax cut

by Ramo
12 November 2026
1

Germany delays its sugar tax to 2028, drops a plastic packaging tax and shelves the electricity tax cut as budget talks begin.

A suspension footbridge with people walking across spans a river, with a cylindrical glass tower and large hotel buildings beyond under blue sky.

Frankfurt housing benefit applications now processed a month faster

by Ramo
11 November 2026
2

Frankfurt's housing benefit office now takes about 3.4 months per application, down from 4.5, but the city won't yet credit its AI tool.

Low-angle view of a tall skyscraper with a curved facade rising against cloudy skies, framed by dark concrete university buildings in the foreground.

Leipzig approves new scheme to help people struggling to find a home

by Ramo
11 November 2026
2

Leipzig's council has approved a 100,000-euro scheme of rent guarantees and landlord deals to house people shut out of the market.

Next Post
A wet, semicircular Roman theatre with stone seating rows, surrounded by trees and lawns, with old buildings and a misty city skyline beyond.

Lyon and Rhône Education Staff Call a Strike for 17 November

Comments 2

  1. Pingback: تمديد إغلاق جسر A100 في برلين (Berlin) حتى 31 يناير - Mylistingo
  2. Pingback: Berliner A100: Brückensperrung bis 31. Januar verlängert - Mylistingo

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Berlin, for internationals

One email a week: what changed for internationals in Berlin, the week's news from Germany, and one guide worth reading. No spam, unsubscribe any time.

Web hosting
Build your website on Hostinger with 20% off your first purchase
Web hosting, VPS servers and an AI website builder. The 20% discount applies through this link.
Get 20% off
Sponsored · Advertise

Popular Story

  • Frankfurt youth protest on 31 October: route, timing and police plans

    Frankfurt youth protest on 31 October: route, timing and police plans

    0 shares
    Share 0 Tweet 0
  • Munich: Max-Weber-Platz works disrupt U4 and U5 until 27 November

    0 shares
    Share 0 Tweet 0
  • The Rundfunkbeitrag: Germany’s Broadcasting Fee

    0 shares
    Share 0 Tweet 0
  • Gen Z regelt calls new protests across Germany for 14 November

    0 shares
    Share 0 Tweet 0
  • Getting a Foreign Degree Recognised in Germany

    0 shares
    Share 0 Tweet 0
logo ainews

Mylistingo: daily news and practical guides for internationals in Germany, in English.

Recent Posts

  • Munich Plans One Central Login for City Services
  • Google DeepMind’s AlphaGenome 2 Tracks Disease Clues Down to Single Cells
  • Berlin A100 Bridge Closure Extended to 31 January

Categories

  • AI & Tech
  • AI & Tech in the Netherlands
  • AI in Business
  • AI in Climate
  • AI in Education
  • AI in Finance
  • AI in Health
  • AI in Law
  • AI in Sport
  • Berlin
  • Economy & Finance
  • Frankfurt
  • Future Tech
  • Germany News
  • Leipzig
  • Machine Learning
  • Moving to Germany
  • Munich
  • Politics & Geopolitics
  • Robotics
  • Social Topics
  • Sport
  • Startups
  • Tools & Apps
  • Uncategorized
  • Weekend Reads

The Hague, for internationals

One email a week: what changed for expats, what's on, one guide worth reading.

  • Home
  • Advertise
  • Latest News
  • Contact Us
  • Data Deletion Instructions
  • Privacy Policy
  • Editorial Policy

  • English
  • العربية
  • Deutsch
No Result
View All Result
  • Home
  • News
  • Berlin
  • Munich
  • Leipzig
  • Frankfurt
  • Moving to Germany
  • Country: Germany
    • Netherlands
    • United Kingdom
    • Germany
    • France
    • Spain
    • All countries